In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?

The correct answer is A. Installed one or two pair cables from the boat slips to a distribution terminal on the closest point of. See the full explanation below for the reasoning.

Question

In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?

Exhibit

RCDD-001 question #300 exhibit

Options

  • AInstalled one or two pair cables from the boat slips to a distribution terminal on the closest point of
  • BPlace distribution cable onto the dock and terminate in a suitable cabinet or enclosure.
  • CPre-cable each boat slip during construction.
  • DFor security, each install should be terminated in the patch panel/cross-connect at the dockmaster or

How the community answered

(37 responses)
  • A
    76% (28)
  • B
    3% (1)
  • C
    8% (3)
  • D
    14% (5)

Community Discussion

No community discussion yet for this question.

Full RCDD-001 Practice