Question
When performing a site survey for a Multiple Channel Architecture (MCA) system in a multi-tenant building with six floors, what aspect should you, as the site surveyor, keep in mind?
Options
- AAll doors and windows in the building should be open during the site survey to assess maximum coverage range.
- BThe omni-directional antennas of the access points should be oriented parallel to the floor to maximize
- CThe channel reuse pattern should be three dimensional with the RF cell extending coverage of each access
- DThe Fresnel Zone is completely blocked between floors so each floor is considered a separate site survey.