nerdexam
CWNP

PW0-105 · Question #49

PW0-105 Question #49: Real Exam Question with Answer & Explanation

Sign in or unlock PW0-105 to reveal the answer and full explanation for question #49. The question stem and answer options stay visible for context.

Question

When performing a site survey for a Multiple Channel Architecture (MCA) system in a multi-tenant building with six floors, what aspect should you, as the site surveyor, keep in mind?

Options

  • AAll doors and windows in the building should be open during the site survey to assess maximum coverage range.
  • BThe omni-directional antennas of the access points should be oriented parallel to the floor to maximize
  • CThe channel reuse pattern should be three dimensional with the RF cell extending coverage of each access
  • DThe Fresnel Zone is completely blocked between floors so each floor is considered a separate site survey.

Unlock PW0-105 to see the answer

You've previewed enough free PW0-105 questions. Unlock PW0-105 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full PW0-105 Practice