CWNP
PW0-105 · Question #42
PW0-105 Question #42: Real Exam Question with Answer & Explanation
Sign in or unlock PW0-105 to reveal the answer and full explanation for question #42. The question stem and answer options stay visible for context.
Question
Given: As a consultant, you have been hired by ABC Company to implement an outdoor WLAN connection between two buildings that are 2 kilometers (1.24 miles) from each other, with no obstructions in between. Your first required objective is to create a point-to-point link between the two buildings within the local regulatory body's 800 mW EIRP maximum. Your second required objective is to provide an industry-standard security solution capable of supporting mutual authentication. As an optional objective, you must minimize the amount of interference from, and to, nearby WLAN networks. You install an OFDM wireless bridge at each building, configuring one in root mode and the other in non-root mode. You set each radio for 100 mW (20 dBm) and attach 9 dBi omni-directional antennas to both. You configure the network for WPA2-Enterprise with PEAPv0/EAP-MSCHAPv2 authentication. Which statement is true about the solution you chose to deploy?
Options
- AYour solution meets both required objectives and the optional objective.
- BYour solution meets the first required objective and the optional objective, but not the second objective.
- CYour solution meets the second required objective and the optional objective, but not the first required objective.
- DYour solution meets neither required objective but meets the optional objective.
- EYour solution meets both required objectives, but does not meet the optional objective.
- FYour solution does not meet either required objective, or the optional objective.
Unlock PW0-105 to see the answer
You've previewed enough free PW0-105 questions. Unlock PW0-105 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.