nerdexam
CWNP

PW0-071 · Question #269

John is a WLAN engineer hired to perform a predictive analysis site survey for a 180,000 squarefoot building. This building space includes small walled offices and cubicles. If John performs a…

The correct answer is B. His amount of time consumed for accurate results in a predictive site survey is much less C. A predictive site survey will allow him to model different scenarios. See the full explanation below for the reasoning.

Question

John is a WLAN engineer hired to perform a predictive analysis site survey for a 180,000 squarefoot building. This building space includes small walled offices and cubicles. If John performs a predictive site survey instead of a manual site survey, what advantages does he get? Each correct answer represents a complete solution. Choose all that apply.

Options

  • AA predictive site survey is the most accurate method available to him.
  • BHis amount of time consumed for accurate results in a predictive site survey is much less
  • CA predictive site survey will allow him to model different scenarios.
  • DHe will be able to determine the interference values of any obstacles.

How the community answered

(18 responses)
  • A
    17% (3)
  • B
    72% (13)
  • D
    11% (2)

Community Discussion

No community discussion yet for this question.

Full PW0-071 Practice