A penetration tester is conducting a test after hours and notices a critical system was taken down. Which of the following contacts should be notified first?

The correct answer is D. Primary. In a penetration testing engagement, the primary contact is the first and main point of communication for any significant issues, including accidental system outages. This individual is typically designated in the rules of engagement to ensure proper protocol is followed for…

Reporting and Communication

Question

A penetration tester is conducting a test after hours and notices a critical system was taken down. Which of the following contacts should be notified first?

Options

  • ASecondary
  • BEmergency
  • CTechnical
  • DPrimary

How the community answered

(37 responses)
  • A
    5% (2)
  • B
    3% (1)
  • C
    5% (2)
  • D
    86% (32)

Why each option

In a penetration testing engagement, the primary contact is the first and main point of communication for any significant issues, including accidental system outages. This individual is typically designated in the rules of engagement to ensure proper protocol is followed for critical incident reporting.

ASecondary

The secondary contact is typically notified if the primary contact is unavailable, not as the first point of notification.

BEmergency

While the incident is an emergency, "Emergency" is not typically a designated role but rather a classification of the situation. The contact type would still be primary or secondary, not "emergency".

CTechnical

The technical contact might be involved in resolving the issue, but the initial notification of a critical incident should go to the primary contact responsible for overseeing the engagement.

DPrimaryCorrect

The primary contact, as outlined in the rules of engagement or contract, is the designated first point of contact for any significant issues or incidents arising during a penetration test, including an accidental critical system shutdown. This ensures proper communication and incident handling protocols are followed.

Concept tested: Penetration testing engagement - Incident reporting hierarchy