Network_Appliance
NS0-521 · Question #60
NS0-521 Question #60: Real Exam Question with Answer & Explanation
Sign in or unlock NS0-521 to reveal the answer and full explanation for question #60. The question stem and answer options stay visible for context.
Question
Click the Exhibit button. A customer is testing a newly installed NetApp AFF A400 all-flash HA storage system. An SVM for FCP with a LUN on Node 1 has been configured, and a server has been connected as shown in the exhibit. For testing, the engineer plans to do a storage failover of Node 1. After the failover, what is the expected status of the marked path?
Options
- AUnavailable
- BActive/Optimized
- CActive/Nonoptimized
- DOffline
Unlock NS0-521 to see the answer
You've previewed enough free NS0-521 questions. Unlock NS0-521 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.