nerdexam
Network_Appliance

NS0-520 · Question #67

An administrator has six VMware hosts, each with dual HBAs that are connected to a dual fabric using single initiator multiple target zoning. Four nodes are being added to the existing 4-node ONTAP…

The correct answer is B. 8. See the full explanation below for the reasoning.

Question

An administrator has six VMware hosts, each with dual HBAs that are connected to a dual fabric using single initiator multiple target zoning. Four nodes are being added to the existing 4-node ONTAP cluster. In this scenario, what is the minimum number of FC zones that need to be updated on each fabric switch?

Options

  • A6
  • B8
  • C4
  • D2

How the community answered

(63 responses)
  • A
    3% (2)
  • B
    78% (49)
  • C
    6% (4)
  • D
    13% (8)

Community Discussion

No community discussion yet for this question.

Full NS0-520 Practice