The correct answer is B. Verify third-party array support by using the Interoperability Matrix Tool (IMT) D. Convert a single FC port on each controller to an FC initiator port E. Create zoning between the third-party array to the FAS8700. We only need to convert one FC to initiator per node, if you need to enable multipath with 2 switches, then you need 2 ports on initiator mode per node
Question
You need to migrate boot LUNs from a third-party array onto a Netapp FAS8700. Which three actions are required to complete this task? (choose three)
Exhibit
Options
- AReboot the third-party SAN to prepare for the LUN Import
- BVerify third-party array support by using the Interoperability Matrix Tool (IMT)
- CConvert every FC target port on each controller to an FC initiator port
- DConvert a single FC port on each controller to an FC initiator port
- ECreate zoning between the third-party array to the FAS8700
Explanation
We only need to convert one FC to initiator per node, if you need to enable multipath with 2 switches, then you need 2 ports on initiator mode per node