The correct answer is B. Verify third-party array support by using the Interoperability Matrix Tool (IMT) D. Convert a single FC port on each controller to an FC initiator port E. Create zoning between the third-party array to the FAS8700. We only need to convert one FC to initiator per node, if you need to enable multipath with 2 switches, then you need 2 ports on initiator mode per node

Question

You need to migrate boot LUNs from a third-party array onto a Netapp FAS8700. Which three actions are required to complete this task? (choose three)

Exhibit

NS0-520 question #190 exhibit

Options

  • AReboot the third-party SAN to prepare for the LUN Import
  • BVerify third-party array support by using the Interoperability Matrix Tool (IMT)
  • CConvert every FC target port on each controller to an FC initiator port
  • DConvert a single FC port on each controller to an FC initiator port
  • ECreate zoning between the third-party array to the FAS8700

Explanation

We only need to convert one FC to initiator per node, if you need to enable multipath with 2 switches, then you need 2 ports on initiator mode per node