You are about to replace a failed Brocade Fibre Channel switch. Which three steps do you take prior to connecting the switch in the SAN? (Choose three.)
The correct answer is B. Change the domain ID of the replacement switch to the domain ID of the failed switch. C. Clear all zoning configurations on the replacement switch. D. Change the core PID format of the replacement switch to the core PID format of the failed switch. See the full explanation below for the reasoning.
Question
You are about to replace a failed Brocade Fibre Channel switch. Which three steps do you take prior to connecting the switch in the SAN? (Choose three.)
Options
- AForce the new switch to be the principle switch.
- BChange the domain ID of the replacement switch to the domain ID of the failed switch.
- CClear all zoning configurations on the replacement switch.
- DChange the core PID format of the replacement switch to the core PID format of the failed switch.
- EPreload the zoning information from the fabric onto the new switch.
How the community answered
(20 responses)- A15% (3)
- B75% (15)
- E10% (2)