Network_Appliance
NS0-513 · Question #16
How are the FC-VI links cabled in MetroCluster for ONTAP? Response:
The correct answer is A. one cable to each of the two local FC switches. See the full explanation below for the reasoning.
Question
How are the FC-VI links cabled in MetroCluster for ONTAP? Response:
Options
- Aone cable to each of the two local FC switches
- Bcontroller A is cabled to FC switch A, controller B has both cabled to FC switch B
- Cdirectly to the corresponding local HA partner
- Ddirectly to the corresponding remote HA partner
How the community answered
(37 responses)- A73% (27)
- B3% (1)
- C16% (6)
- D8% (3)
Community Discussion
No community discussion yet for this question.