You have a new FAS8080EX 2-node cluster. The FC switch ports connected to the onboard UTA2 ports will not come online. Which two node-based issues would case the problem? (Choose two.)
Options
- AThe UTA2 ports are set to target.
- BThe UTA2 ports have 10 GB SFP+ optics installed.
- CThe UTA2 ports have 16 GB SFP+ optics installed.
- DThe UTA2 ports are in cna mode.