To provide a complete connectivity and cabling plan prior to FC SAN deployment, which statement true?
The correct answer is D. Switch and controller management network connectivity must be verified. See the full explanation below for the reasoning.
Question
To provide a complete connectivity and cabling plan prior to FC SAN deployment, which statement true?
Options
- AVM administrators must be consulted to ensure optimum ESXi host loading
- BOnce LUN mapping planning is complete, the job is done.
- CFinal FC storage architecture is the sole requirement.
- DSwitch and controller management network connectivity must be verified.
How the community answered
(51 responses)- A6% (3)
- B4% (2)
- C16% (8)
- D75% (38)