NS0-182 · Question #20

A customer buys a new switchless ONTAP 9.5 FAS2650 cluster. You are asked to install the system at the customer's site. Which three steps are needed to accomplish this task? (Choose three.)

The correct answer is C. Connect both power cords. D. Install the system in the rack. E. Cable the controller for switchless ONTAP software. See the full explanation below for the reasoning.

Question

A customer buys a new switchless ONTAP 9.5 FAS2650 cluster. You are asked to install the system at the customer's site. Which three steps are needed to accomplish this task? (Choose three.)

Options

  • ACable the ACP.
  • BCable the cluster-interconnect to the CN1610 switches.
  • CConnect both power cords.
  • DInstall the system in the rack.
  • ECable the controller for switchless ONTAP software.

How the community answered

(27 responses)
  • A
    15% (4)
  • B
    4% (1)
  • C
    81% (22)