You are asked to ensure link redundancy to your hosts using Virtual Port Channel (vPC). You are creating a vPC on a pair of Cisco Nexus switches. In this scenario, which two steps are required to…
The correct answer is B. Configure the vPC peer keep-alive link C. Create a vPC domain. You've hit your limit · resets 5am (America/New_York)
Cisco Networking Design
Question
You are asked to ensure link redundancy to your hosts using Virtual Port Channel (vPC). You are creating a vPC on a pair of Cisco Nexus switches. In this scenario, which two steps are required to accomplish this task? (Choose two.)
Options
- ASet all vPC ports to switchport mode access
- BConfigure the vPC peer keep-alive link
- CCreate a vPC domain
- DConfigure system priority
How the community answered
(39 responses)- A10% (4)
- B69% (27)
- D21% (8)