You are asked to ensure link redundancy to your hosts using Virtual Port Channel (vPC). You are creating a vPC on a pair of Cisco Nexus switches. In this scenario, which two steps are required to…

The correct answer is B. Configure the vPC peer keep-alive link C. Create a vPC domain. You've hit your limit · resets 5am (America/New_York)

Cisco Networking Design

Question

You are asked to ensure link redundancy to your hosts using Virtual Port Channel (vPC). You are creating a vPC on a pair of Cisco Nexus switches. In this scenario, which two steps are required to accomplish this task? (Choose two.)

Options

  • ASet all vPC ports to switchport mode access
  • BConfigure the vPC peer keep-alive link
  • CCreate a vPC domain
  • DConfigure system priority

How the community answered

(39 responses)
  • A
    10% (4)
  • B
    69% (27)
  • D
    21% (8)

Explanation