Question
A customer has a MetroCluster in which one site had suffered a power outage. The MetroCluster performed a switchover to the secondary site. The storage administrator is now preparing to run a DR switchback, to restore normal operations across the two sites for the MetroCluster. Which two commands does the administrator have to run before the switchback? (Choose two).
Options
- Astorage aggregate mirror
- Bmetrocluster heal root-aggregates
- Cmetrocluster heal aggregates
- Dsnapmirror resync