In the event of a primary datacenter failure. A customer wants to power on virtual machines in a secondary datacenter with an RPO and RTO of no more than 15 minutes. Upon further discussions with the customer. the systems engineer (SE) finds that round trip latency between the 2 sites ca reach up to 6ms. Which Nutanix feature should the SE recommend?
Options
- AMetro Availability
- BRack Awareness
- CNearSync
- DFault Tolerance FT1