Question
An SE is performing workload discovery with an SMB prospect running SQL Server. The databases is less than 1 TB, but its performance and uptime are critical to the prospect's business operations. Sizer sugests using 1065S nodes. Which aspects of the NX-1065S-G5 would cause an SE to filter out that nodel from Sizer's Automatic configuration? (choose two.)
Options
- ASingle Power Supply
- BLimited to 4 nodes
- C1Gb Networking
- DSingle HDD
- ESingle Socket Processor
Unlock NCSE-CORE to see the answer