A network architect of a stock exchange broker is implementing a disaster recovery (DR) high- availability plan. Which of the following approaches would be the best fit?

The correct answer is B. Active-active. In financial institutions such as stock exchanges, downtime or latency can have severe consequences. Active-active high availability ensures multiple sites/systems are running simultaneously, distributing the load and providing immediate failover with minimal or no…

Submitted by tyler.j· Mar 6, 2026Network operations

Question

A network architect of a stock exchange broker is implementing a disaster recovery (DR) high- availability plan. Which of the following approaches would be the best fit?

Options

  • AWarm site
  • BActive-active
  • CFull mesh
  • DIn-band

How the community answered

(22 responses)
  • A
    5% (1)
  • B
    77% (17)
  • C
    5% (1)
  • D
    14% (3)

Explanation

In financial institutions such as stock exchanges, downtime or latency can have severe consequences. Active-active high availability ensures multiple sites/systems are running simultaneously, distributing the load and providing immediate failover with minimal or no interruption. This is the best approach for environments that require continuous uptime and