You need to have multiple price calculations for the same cost basis in Microsoft Dynamics AX 2012. Which condition must be met for this to occur?
The correct answer is B. The effective periods must not overlap. See the full explanation below for the reasoning.
Question
You need to have multiple price calculations for the same cost basis in Microsoft Dynamics AX 2012. Which condition must be met for this to occur?
Options
- AThe site must be different for each cost basis type.
- BThe effective periods must not overlap.
- CThe effective periods must overlap.
- DThe effective periods must be blank.
How the community answered
(40 responses)- A10% (4)
- B85% (34)
- C3% (1)
- D3% (1)