MB6-703 · Question #43
You create a new product that has a new bill of materials (BOM). The lines for each component are added to the BOM lines. You need to configure the BOM to prevent the line for item 700 and the line…
The correct answer is D. A configuration rule for item 700 by using the Deselect method for 500. Configuration Rule Methods: The following methods are available: / Deselect The derived configuration group, item number, and configuration cannot be selected if the combination specified in the Configuration group and Item number fields is selected when you set the…
inventory configuration
Question
You create a new product that has a new bill of materials (BOM). The lines for each component are added to the BOM lines. You need to configure the BOM to prevent the line for item 700 and the line for item 500 from both being selected in the BOM. What should you create?
Exhibit
Options
- AA configuration route for item 700 by using the Select method for 500
- BA configuration rule for item 700 by using The Select method for 500
- CA configuration route for item 700 by using the Deselect method for 500
- DA configuration rule for item 700 by using the Deselect method for 500
How the community answered
(37 responses)- A8% (3)
- B14% (5)
- C5% (2)
- D73% (27)
Explanation
- Configuration Rule Methods: The following methods are available: / Deselect The derived configuration group, item number, and configuration cannot be selected if the combination specified in the Configuration group and Item number fields is selected when you set the configuration. / Select The derived configuration group, item number, and configuration will automatically be selected if the combination specified in the Configuration group and Item number fields is selected when you set the configuration.
Topics
#bill of materials#configuration rule#deselect method#BOM constraints