MB-335 · Question #224
You are configuring the production floor execution interface in Dynamics 365 Supply Chain Management. The current configuration of the production floor execution interface hinders efficient…
The correct answer is B. Select specific tabs to display in the production floor execution interface. Use the settings on the Tab selection FastTab to select which tabs the production floor execution interface should show when the current configuration is active. You can design as many tabs as you need, and then add and arrange them as you require by using the buttons on the…
Question
You are configuring the production floor execution interface in Dynamics 365 Supply Chain Management. The current configuration of the production floor execution interface hinders efficient production floor operations and impedes worker productivity. You need to optimize the production floor execution interface configuration. What should you do?
Options
- AEnable Use the actual time of registration and Single worker.
- BSelect specific tabs to display in the production floor execution interface.
- CDeactivate Use the actual time of registration and Single worker.
- DActivate Allow locking the touchscreen and then specify a Screen lock duration.
How the community answered
(53 responses)- A4% (2)
- B81% (43)
- C11% (6)
- D4% (2)
Explanation
Use the settings on the Tab selection FastTab to select which tabs the production floor execution interface should show when the current configuration is active. You can design as many tabs as you need, and then add and arrange them as you require by using the buttons on the FastTab https://learn.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-floor- execution-configure
Topics
Community Discussion
No community discussion yet for this question.