A company plans to create a product that contains multiple bill of materials (BOM) levels. The product has several components that have both constant and variable costs. You need to calculate the…

The correct answer is A. Multilevel. You've hit your limit · resets 4am (America/New_York)

Implement product information management

Question

A company plans to create a product that contains multiple bill of materials (BOM) levels. The product has several components that have both constant and variable costs. You need to calculate the planned cost for producing the product with manufacturing volumes. Which explosion mode should you select? Select only one answer.

Options

  • AMultilevel
  • BMake to order
  • CSingle level
  • DAccording to BOM line type

How the community answered

(57 responses)
  • A
    74% (42)
  • B
    4% (2)
  • C
    7% (4)
  • D
    16% (9)

Explanation

You've hit your limit · resets 4am (America/New_York)

Topics

#BOM explosion mode#multilevel BOM#planned cost#manufacturing volumes