Juniper
JN0-649 · Question #74
JN0-649 Question #74: Real Exam Question with Answer & Explanation
Sign in or unlock JN0-649 to reveal the answer and full explanation for question #74. The question stem and answer options stay visible for context.
Question
A customer on MSTI-2 was isolated due to a physical link outage on Switch 5's ge-0/0/32 interface. Referring to the exhibit, which corrective action would solve this problem?
Exhibit
Options
- Areplace the link between Switch 5 and 6 with a 10 Gbps link
- BImplement the CIST on all switches.
- CMove the root bridge for MSTI-2 to Switch 6.
- DAdd MSTI-2 to all interfaces on Switch 5.
Unlock JN0-649 to see the answer
You've previewed enough free JN0-649 questions. Unlock JN0-649 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.
