JN0-370 · Question #232

A customer wants to set up a QFX3000-M QFabric system, which includes Director devices, Interconnect devices, Node devices, and EX4200 switches. The network engineer wants to know the proper task…

The correct answer is C. Deploy the control plane network, Director group, and then the system components. See the full explanation below for the reasoning.

Question

A customer wants to set up a QFX3000-M QFabric system, which includes Director devices, Interconnect devices, Node devices, and EX4200 switches. The network engineer wants to know the proper task sequence when configuring the QFabric system for the first time. In which sequence should the tasks be deployed?

Options

  • ADeploy the Director group, control plane network, and then the system components.
  • BDeploy the system components, Director group, and then the control plane network.
  • CDeploy the control plane network, Director group, and then the system components.
  • DDeploy the system components, Director group, and then the control plane network.

How the community answered

(21 responses)
  • A
    14% (3)
  • B
    10% (2)
  • C
    71% (15)
  • D
    5% (1)