Click the Exhibit button. Switch 1 and Switch 2 are configured to run MSTP. However, MSTP is not working. Referring to the exhibit, which two actions will correct the problem? (Choose two.)

The correct answer is C. Configure revision-level 2 on Switch 1. D. Correct the configuration-name parameter to be identical on both switches. See the full explanation below for the reasoning.

Question

Click the Exhibit button. Switch 1 and Switch 2 are configured to run MSTP. However, MSTP is not working. Referring to the exhibit, which two actions will correct the problem? (Choose two.)

Options

  • AConfigure interface ge-0/0/2 on Switch 2
  • BCorrect the bridge-priority parameter to be identical on both switches.
  • CConfigure revision-level 2 on Switch 1.
  • DCorrect the configuration-name parameter to be identical on both switches.

How the community answered

(51 responses)
  • A
    20% (10)
  • B
    10% (5)
  • C
    71% (36)