Juniper
JN0-348 · Question #107
You received an alert from your monitoring system that the master Routing Engine (RE) on an EX4300 switch in a virtual chassis has hardware issues and might need to be replaced. Because the switch…
The correct answer is B. Log in to the backup RE and issue therequest chassis routing-engine master switchoperation. See the full explanation below for the reasoning.
Question
You received an alert from your monitoring system that the master Routing Engine (RE) on an EX4300 switch in a virtual chassis has hardware issues and might need to be replaced. Because the switch already had graceful Routing Engine switchover (GRES) enabled and configured, you must perform a manual switchover to the backup RE to avoid disruption. Which command would be used to perform the manual RE switchover?
Options
- ALog in to the backup RE and issue therequest chassis-control operation command.
- BLog in to the backup RE and issue therequest chassis routing-engine master switchoperation
- CLog in to the backup RE and issue therequest chassis routing-engine master acquireoperation
- DLog in to the backup RE andissue therequest iccp-serviceoperation command.
How the community answered
(51 responses)- A4% (2)
- B82% (42)
- C10% (5)
- D4% (2)
Community Discussion
No community discussion yet for this question.