Question

You are asked to enable Mist management at an existing site with previously configured EX3400 brownfield switches, and to add a new greenfield switch. Which statement is correct in this scenario?

Options

  • AYou can mix brownfield switches and greenfield switches as long as they are running a Mist-
  • BBrownfield switches can be adopted but not managed.
  • CYou cannot mix greenfield and brownfield switches at the same site.
  • DYou can mix brownfield switches and greenfield switches at the same site, but only if they are