nerdexam
ISTQB

ISTQB-CTFL · Question #95

ISTQB-CTFL Question #95: Real Exam Question with Answer & Explanation

Sign in or unlock ISTQB-CTFL to reveal the answer and full explanation for question #95. The question stem and answer options stay visible for context.

Question

A program is used to control a manufacturing line (turn machines on and off. start and stop conveyer belts, add raw materials to the flow. etc.). Not all actions are possible at all times. For example, there are certain manufacturing stages that cannot be stopped - unless there is an emergency. A tester attempts to evaluate if all such cases (where a specific action is not allowed) are covered by the tests. Which coverage metric will provide the needed information for this analysis?

Options

  • ACode coverage
  • BData flow coverage
  • CStatement coverage
  • DBranch Coverage

Unlock ISTQB-CTFL to see the answer

You've previewed enough free ISTQB-CTFL questions. Unlock ISTQB-CTFL for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full ISTQB-CTFL Practice