ICBB · Question #325

Why a re-analysis of measurement system is required in a Six Sigma project?

The correct answer is D. Re-analysis is done only when the previous analysis is detected to be incorrect. You've hit your session limit · resets 5:20pm (America/New_York)

Question

Why a re-analysis of measurement system is required in a Six Sigma project?

Options

  • AIt is mandatory requirement as per MSA
  • BMore precise measurements may be required due to reduction in variability
  • CSince most of the Six Sigma projects use statistical softwares that require re-analysis
  • DRe-analysis is done only when the previous analysis is detected to be incorrect

How the community answered

(40 responses)
  • A
    18% (7)
  • B
    3% (1)
  • C
    8% (3)
  • D
    73% (29)

Explanation

You've hit your session limit · resets 5:20pm (America/New_York)