ICBB · Question #128

Which of the control charts must have at least 20 subgroups of observed values to judge whether a process is in control or not?

The correct answer is A. R-Chart. An R-chart contains data gathered at regular intervals. It measures the sample range over time which is a measure of dispersion. The R-chart must have at least 20 subgroups of observed values with each subgroup containing 3 to 6 observations. With these minimum number of…

Troubleshooting and Optimization of Campus Mobility

Question

Which of the control charts must have at least 20 subgroups of observed values to judge whether a process is in control or not?

Options

  • AR-Chart
  • BP-Chart
  • CC-Chart
  • DY-Chart

How the community answered

(49 responses)
  • A
    76% (37)
  • B
    4% (2)
  • C
    14% (7)
  • D
    6% (3)

Explanation

An R-chart contains data gathered at regular intervals. It measures the sample range over time which is a measure of dispersion. The R-chart must have at least 20 subgroups of observed values with each subgroup containing 3 to 6 observations. With these minimum number of observations, it is convenient to observe whether the variation falls within the upper and lower

Topics

#R-chart#control charts#subgroup requirements#statistical process control