HQT-4180 Exam Questions
71 real HQT-4180 exam questions with expert-verified answers and explanations. Page 1 of 2.
- Question #1
You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration. Which set of IP addresses is configured with the ISW?
- Question #2
You are installing a VSP F370 and you need to connect your laptop to one of the controllers. What are the two default IP addresses of the maintenance ports of CTL1 and CTL2? (Choos...
- Question #3
Which tool do you use to install license keys on a VSP G370 system?
- Question #4
Which tool monitors a VSP E590 system and reports System Information Messages (SIMs)?
- Question #5
Which two statements are correct when adding cache to a VSP E590? (Choose two.)
- Question #6
A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel...
- Question #7
Which tool can be used to change System Option Modes (SOMs)?
- Question #8
You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900. What are two requirements? (Choose two.)
- Question #9
You need to upgrade the firmware on a VSP G700. Which file must you select to perform the upgrade using the Maintenance Utility?
- Question #10
Which tool is used for the remote monitoring of a VSP N800 system?
- Question #11
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)
- Question #12
What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?
- Question #13
What is the recommended RAID level when creating a Hitachi Dynamic Provisioning (HDP) pool?
- Question #14
One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system. What are two requirements to separate the I/Os of the servers? (Choose two.)
- Question #15
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port. What should you do next?
- Question #16
Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.)
- Question #17
A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel p...
- Question #18
What are the internal components of VSP midrange storage systems primarily responsible for?
- Question #20
The SVP of a VSP G900 system failed and you have been asked to replace it. Which two items must be available to perform the replacement? (Choose two.)
- Question #21
What are two functions of the LAN Blade in the VSP Midrange family? (Choose two.)
- Question #22
A customer wants to upgrade a VSP G700 to 512 GB RAM capacity. What is the valid CFM configuration?
- Question #23
How many batteries does a VSP E1090 have per controller (CTL)?
- Question #25
Which three RAID configurations are supported by VSP Midrange systems? (Choose three.)
- Question #26
A customer wants to upgrade their VSP E790 with a SAS Expansion feature. What are three requirements? (Choose three.)
- Question #27
What are two valid back-end SAS cable connections on a VSP midrange system? (Choose two.)
- Question #28
How are program products enabled on VSP midrange storage systems?
- Question #29
Which back-end hardware component of VSP midrange storage systems is responsible for storing the actual data?
- Question #30
What are two consequences when a "New Installation" procedure is performed on a VSP Midrange system? (Choose two.)
- Question #31
Which two VSP systems support attached Drive Box Flash (DBF)? (Choose two.)
- Question #32
A drive in a 3D + 1P RAID group fails in a VSP G700 and there is no spare drive available. Which two actions are automatically performed by the system? (Choose two.)
- Question #33
Which manual should be used when performing maintenance actions on VSP midrange storage systems?
- Question #34
What are two consequences when a "New Installation" procedure is performed on a VSP Midrange system? (Choose two.)
- Question #35
Which program is used to perform the "New Installation" procedure on a VSP midrange system?
- Question #36
Which two tools are available to configure NTP server settings on a VSP E590 system? (Choose two.)
- Question #37
You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration. Which set of IP addresses is configured with the ISW?
- Question #38
When is the "New Installation" procedure for VSP midrange storage systems typically used?
- Question #39
A storage administrator wants to present an LDEV to a server attached to a newly installed VSP One B28 system. Two Host Groups have been created on ports CL3-A and CL4-A for this s...
- Question #40
How are system logs and error messages utilized when troubleshooting VSP midrange storage systems?
- Question #41
Which program is used to perform the "New Installation" procedure on a VSP F700 system?
- Question #42
You need to replace a broken disk drive on a VSP G700. What are two prerequisites? (Choose two.)
- Question #43
You need to replace a broken fan in a VSP E1090. What is the correct procedure?
- Question #44
You need to replace a failing power supply (PS) in a VSP E590. What is the correct procedure?
- Question #45
Which two specifications may differ between models within the VSP Midrange family? (Choose two.)
- Question #46
A customer wants to upgrade a VSP E1090 to 1TB RAM capacity. What is the valid Cache Flash Memory (CFM) configuration?
- Question #47
In the VSP Midrange family, which module provides power to the Cache Flash Memory (CFM) and to the cache in case of a power outage?
- Question #48
Which three VSP Midrange storage arrays support hardware compression? (Choose three.)
- Question #49
How many Disk Boards (DKBs) are included in a VSP E1090 system with at least one Drive Box (DB) attached?
- Question #50
What are two supported SAS back-end transfer speeds on the VSP Midrange systems? (Choose two.)
- Question #51
A customer has a VSP E1090 with four attached NVMe drive boxes (DBNs). How many back-end cables are used?
- Question #52
A drive in a VSP One B24 system is configured in a Dynamic Drive Protection (DDP) group. If this drive gets blocked as a result of a failure which process automatically starts to k...