HPE7-A08 · Question #54
Which actions should be taken before deploying a configuration change to Aruba switches? (Select two.)
The correct answer is A. Perform a rollback plan test C. Verify the configuration in a test environment. Before deploying any configuration change to production network infrastructure like Aruba switches, verifying in a test environment (C) ensures the change behaves as expected without risking live traffic, and performing a rollback plan test (A) confirms you can quickly restore…
Question
Which actions should be taken before deploying a configuration change to Aruba switches? (Select two.)
Options
- APerform a rollback plan test
- BApply changes directly to all switches simultaneously
- CVerify the configuration in a test environment
- DDisable all redundant links before applying changes
How the community answered
(34 responses)- A88% (30)
- B6% (2)
- D6% (2)
Explanation
Before deploying any configuration change to production network infrastructure like Aruba switches, verifying in a test environment (C) ensures the change behaves as expected without risking live traffic, and performing a rollback plan test (A) confirms you can quickly restore the previous state if something goes wrong - both are foundational change management practices.
Why the distractors are wrong:
- B is dangerous: applying changes to all switches simultaneously eliminates the ability to catch errors before they cascade across the entire network; always stage changes incrementally.
- D is counterproductive: disabling redundant links removes your safety net (failover paths) right before a risky change, maximizing potential downtime if the change causes issues.
Memory tip: Think "Test before you touch, and plan your escape route" - C = test environment first, A = escape route (rollback) tested and ready. Both happen before production, never during or after.
Topics
Community Discussion
No community discussion yet for this question.