Question

The customer requires two Aruba CX 6200F 48G switches to be connected to each other with a distance of 80m/252ft between wiring closets. Switches need to have reservation for VSF expansion with ring topology in each cabinet. What is a valid configuration for a redundant link-aggregation port configuration?

Options

  • APorts 1/1/49 and 1/1/50 with SFP28 for LAG
  • BPorts 1/1/47 and 1/1/48 for LAG
  • CPorts 1/1/1 and 1/1/2 for LAG
  • DPorts 1/1/51 and 1/1/52 with SFP+ for LAG