nerdexam
HP

HPE6-A80 · Question #41

HPE6-A80 Question #41: Real Exam Question with Answer & Explanation

The correct answer is B. Connect the switch stack on each floor directly to the network cone on two "fiber connections per floor. Achieve this by patching the inter-floor fiber through to E. Add two aggregation switches in the Floor 1closet. Connect the switch stack for each closet to the aggregation switches on two fiber links each and the. See the full explanation below for the reasoning.

Question

Refer to the exhibit. A customer needs a wired upgrade for a building on its main campus. The exhibit shows the switches that the architect has selected for each closet and me existing cabling. The customer is not open to changing the cabling. The customer requires link redundancy for the uplinks from each closet and for the links from the building to the core. In non link failure situations, the uplinks from each closet must support at least 20Gbps, and the building as a whole must have at least 20 Gbps to the core in non link failure situations. Which two options Tor connecting the closets to the network core are valid? (select two.)

Exhibit

HPE6-A80 question #41 exhibit

Options

  • AConnect me Floor 2 switch stack to Floor 1 with two fiber connections, DO me same for Floor 3.
  • BConnect the switch stack on each floor directly to the network cone on two "fiber connections per floor. Achieve this by patching the inter-floor fiber through to
  • CCombine the nine switches on the three floors into a single switch stack with the MM QM3 fiber cables in a ring topology. Connect two Floor 1 members to the
  • DCombine the nine switches on all three floors into a single switch slack with stacking cables in a ring topology.
  • EAdd two aggregation switches in the Floor 1closet. Connect the switch stack for each closet to the aggregation switches on two fiber links each and the

Community Discussion

No community discussion yet for this question.

Full HPE6-A80 Practice