Refer to the exhibit. A company needs a new wireless solution for its multi-site network. All branch sites must connect to the main site through secure tunnels over the Internet. The customer…

The correct answer is C. all of the MCs at 2. See the full explanation below for the reasoning.

Question

Refer to the exhibit. A company needs a new wireless solution for its multi-site network. All branch sites must connect to the main site through secure tunnels over the Internet. The customer requires full redundancy for the Mobility Controllers (MC). Including stateful faiEoverand seamless roaming for the main site. The architect plans to propose:

  • 500 RAPS
  • 100 APs at the main campus
  • two 7205 MCs
  • two 7210 MCS
  • one MM appliance

The exhibit snows the existing wired network at the main site, which has a single building with two large floors. Following the best-practices on design, performance and security, where should the architect plan to connect the MCs? (Potential locations are numbered in the exhibit.)

Exhibit

HPE6-A80 question #31 exhibit

Options

  • Atwo 7205 MCs at 2; two 7210 MCs at 1
  • Bone 7205 MC at 3 and one at 4; two 7210 MCs at 1
  • Call of the MCs at 2
  • Dtwo 7205 MCS at 1; two 7210 MCS at 2

How the community answered

(29 responses)
  • A
    7% (2)
  • B
    7% (2)
  • C
    83% (24)
  • D
    3% (1)