nerdexam
HP

HPE6-A73 · Question #131

HPE6-A73 Question #131: Real Exam Question with Answer & Explanation

Sign in or unlock HPE6-A73 to reveal the answer and full explanation for question #131. The question stem and answer options stay visible for context.

Question

Examine the configuration of Core-1 and Core-2. AOS-CX switches configured as a VSX stack:
Core1: interlace lag 256
no shutdown
no routing
vlan trunk allowed all
lacp mode active Interface 1/1/46
no shutdown
lag 256 Interface 1/1/47
no shutdown
lag 256
vsx
Inter-switch-link lag 256
vsx-sync vsx-global
exit
Core2: interlace lag 250
no shutdown
no routing
vlan trunk allowed all
lacp mode active
Interface 1/1/46
no shutdown
lag 256 Interface 1/1/47
no shutdown
lag 256
vsx
Inter-switch-link lag 256
exit
When using the "show vsx status" command, the two switches fall to connect and successfully synchronize. What should the administrator do to fix this issue?

Options

  • ADefine a larger MTU on the ISL link of the two switches.
  • BDefine the VSX roles on the two switches.
  • CEnable active-active forwarding on the two switches.

Unlock HPE6-A73 to see the answer

You've previewed enough free HPE6-A73 questions. Unlock HPE6-A73 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full HPE6-A73 Practice