nerdexam
HP

HPE6-A66 · Question #42

HPE6-A66 Question #42: Real Exam Question with Answer & Explanation

Sign in or unlock HPE6-A66 to reveal the answer and full explanation for question #42. The question stem and answer options stay visible for context.

Question

A network architect is given the task to design a new network solution for NewStellar Company, Inc. NewSteiiar has a main corporate campus in a business park with two adjacent buildings. The network architect has given one floor to analyze, Building 1 Floor 2, shown in the attached exhibit. Each building has three floors and each floor is 322 x 175 feet (98 x 53 meters) for 56,350 square feet (5,235 square meters) total, which results in a total of 338,100 feet (31,410 square meters) for the entire building space. Each floor has a central main corridor with washrooms, stairs, elevators and supply and network cabinets. There are cubicles around the perimeter of the floor. The central part main corridor's dimensions contain 9,350 square feet {870 square meters). Because of security concerns, video cameras will be installed throughout the facility. There are 16 of these per floor, 8 per wiring closet. The cameras are non-WiFi capable and require POE 802.3af- capable switch ports from which to draw power. A wireless capacity design is required. Assuming that wireless coverage is required across the Building 1, Floor 2, including the central area, and that half the required APs will connect to each wiring closet, approximately how many POE+ ports will be required per wiring closet for all devices that have POE or POE+ needs?

Exhibit

HPE6-A66 question #42 exhibit

Options

  • A30
  • B22
  • C42
  • D8

Unlock HPE6-A66 to see the answer

You've previewed enough free HPE6-A66 questions. Unlock HPE6-A66 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full HPE6-A66 Practice