nerdexam
HP

HPE6-A47 · Question #41

Refer to the exhibit. The exhibit shows the current plan for a wired network upgrade. As much as possible, the customer wants to flatten the architecture and avoid recabling. However, each Building…

The correct answer is C. Combine the switches in each Building 2 closet as a VSF fabric; establish two 10 GbE connections to the core per fabric. See the full explanation below for the reasoning.

Question

Refer to the exhibit. The exhibit shows the current plan for a wired network upgrade. As much as possible, the customer wants to flatten the architecture and avoid recabling. However, each Building 2 switch must also maintain connectivity to the core if one link fails. What should the architect propose to meet the customer requirements?

Exhibit

HPE6-A47 question #41 exhibit

Options

  • AUse two additional 2930F switches to act as an aggregation layer for Building 2; connect them to the core on 40 GbE connections.
  • BConnect each Building 2 switch directly to the core on a single fiber strand through the use of SFP+-SR transceivers.
  • CCombine the switches in each Building 2 closet as a VSF fabric; establish two 10 GbE connections to the core per fabric.
  • DExtend additional fiber between the buildings so that each Building 2 switch can have a direct 10 GbE connection to the core.

How the community answered

(55 responses)
  • A
    13% (7)
  • B
    9% (5)
  • C
    75% (41)
  • D
    4% (2)

Community Discussion

No community discussion yet for this question.

Full HPE6-A47 Practice