nerdexam
HP

HPE6-A41 · Question #112

HPE6-A41 Question #112: Real Exam Question with Answer & Explanation

Sign in or unlock HPE6-A41 to reveal the answer and full explanation for question #112. The question stem and answer options stay visible for context.

Question

Refer to the exhibits. Switch-1 VSF configuration:
vsf
member 1 type "29850k"
priority 128
link 1 1/A23-1/A24,1/B23-1/B24
link 1 name "1-link1_1"
exit
Switch-2 VSF configuration:
vsf
member 2 type "29850k"
priority 128
link 1 2/A23-2/A24,2/B23-2/B24
link 1 name "1-link2_1"
exit
Switch-1 and Switch-2 have the Virtual Switching Framework (VSF) settings shown in the exhibits. The administrator then connects the switches together on the configured VSF link but the VSF link does not form. The administrator first enables VSF on Switch-1 and confirms the reboot. After that process ends, the administrator enables VSF on Switch-2 and confirms the reboot. What happens?

Options

  • ASwitch-1 and Switch-2 form a VSF fabric, and Switch-1 becomes the commander.
  • BSwitch-1 and Switch-2 form a VSF fabric, and Switch-2 becomes the commander.
  • CSwitch-1 and Switch-2 fail to form a VSF fabric, and all interfaces on both switches remain up.
  • DSwitch-1 and Switch-2 form a VSF fabric, and all interfaces on Switch-1 are disabled.

Unlock HPE6-A41 to see the answer

You've previewed enough free HPE6-A41 questions. Unlock HPE6-A41 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full HPE6-A41 Practice