nerdexam
HP

HPE6-A40 · Question #20

A network engineer plans to deploy RAP. The company requires RAP to have redundancy so that it can failover to another controller if the primary controller fails. Which RAP configuration should the…

The correct answer is C. Master and Local. Explanation/Reference:

Implement and Manage High Availability and Redundancy

Question

A network engineer plans to deploy RAP. The company requires RAP to have redundancy so that it can failover to another controller if the primary controller fails. Which RAP configuration should the engineer implement to meet these requirements?

Options

  • AMaster Standby
  • BLMS and backup LMS
  • CMaster and Local
  • DHigh availability: Fast Failover

How the community answered

(47 responses)
  • A
    4% (2)
  • B
    15% (7)
  • C
    74% (35)
  • D
    6% (3)

Explanation

Explanation/Reference:

Topics

#RAP redundancy#Master and Local#controller failover#backup controller