Question

You are installing a server solution in a customer's data center. How can you ensure that the installation complies with relevant electrical best practices? (Choose two.)

Options

  • AUse a single-phase, two-wire power receptacle with protective earth or ground (PE) to filter
  • BDo not allow the overall system AC current load to exceed 80% of the branch circuit AC current
  • CUse fanout cables when connecting the server to the network for maximum electrical impedance
  • DBalance the server power load between available AC supply branch circuits
  • EConfigure the server power to a single electrical circuit in the data center