HPE0-S48 · Question #24

A facility has several Gen9 Blade Systems, one of which failed. The integrator needs to configure an Active/Active configuration for high availability so the failure is avoided in the future. How…

The correct answer is C. 1 FlexFabric module, 2 Top of Rack switches. See the full explanation below for the reasoning.

Question

A facility has several Gen9 Blade Systems, one of which failed. The integrator needs to configure an Active/Active configuration for high availability so the failure is avoided in the future. How many FlexFabric modules and switches does the integrator need, at a minimum, to achieve this?

Options

  • A2 FlexFabric modules, 1 Top of Rack switch
  • B1 FlexFabric module, 1 data center switch
  • C1 FlexFabric module, 2 Top of Rack switches
  • D2 FlexFabric modules, 2 data center switches

How the community answered

(22 responses)
  • A
    5% (1)
  • B
    9% (2)
  • C
    86% (19)

Community Discussion

No community discussion yet for this question.