nerdexam
HP

HPE0-J80 · Question #33

A storage architect is reviewing customer as-built documentation and a proposed design for an HPE 3PAR StoreServ deployment. The array must be installed in a co-location facility in facility…

The correct answer is A. The correct number of SAS Active Optical Cables (AOC) are required. See the full explanation below for the reasoning.

Question

A storage architect is reviewing customer as-built documentation and a proposed design for an HPE 3PAR StoreServ deployment. The array must be installed in a co-location facility in facility supplied and managed racks. The storage architect has determined that service clearances and power are adequate. The proposed design is storage-centric and will require two racks to accommodate all the disk enclosures. What should the storage architect consider when validating the bill of materials?

Options

  • AThe correct number of SAS Active Optical Cables (AOC) are required
  • BThe correct number of infiniBand cables are required
  • CExpansion is only supported in HPE racks
  • DThe correct number of Fiber Channel Cables are required

How the community answered

(38 responses)
  • A
    76% (29)
  • B
    13% (5)
  • C
    5% (2)
  • D
    5% (2)

Community Discussion

No community discussion yet for this question.

Full HPE0-J80 Practice