nerdexam
HP

HPE0-J79 · Question #28

A storage architect is reviewing customer as-built documentation and a proposed design for an HPE 3PAR StoreServ deployment. The array must be installed in a co-location facility in facility…

The correct answer is D. The correct number of SAS Active Optical Cables (AOC) are required. See the full explanation below for the reasoning.

Question

A storage architect is reviewing customer as-built documentation and a proposed design for an HPE 3PAR StoreServ deployment. The array must be installed in a co-location facility in facility- supplied and managed racks. The storage architect has determined that service clearances and power are adequate. The proposed design is storage-centric and will require two racks to accommodate all the disk enclosures. What should the storage architect consider when validating the bill of materials?

Options

  • AExpansion is only supported in HPE racks
  • BThe correct number of Infiniband cables are required.
  • CThe correct number of Fibre Channel cables are required
  • DThe correct number of SAS Active Optical Cables (AOC) are required

How the community answered

(42 responses)
  • A
    5% (2)
  • B
    2% (1)
  • C
    10% (4)
  • D
    83% (35)

Community Discussion

No community discussion yet for this question.

Full HPE0-J79 Practice