You are designing a solution that will have a new HPE Synergy frame and an HPE 3PAR StoreServ 8200 storage array with only the built-in ports. This new environment must keep the infrastructure within the data center to a minimum. Which interconnect module will achieve this goal?

Options

  • ASynergy 25-50Gb F8 Switch Module
  • B6125G/XG Ethernet Blade Switch
  • CSynergy 20Gb interconnect Link Module
  • DVirtual Connect SE 40Gb F8 Module

Unlock HPE0-J57 to see the answer