HP
HP2-Z34 · Question #81
Refer to exhibit. The switches in the exhibit form TRILL region. How can the administrator encourage the switches to load-balance broadcasts, multicasts, and unknown unicasts over multiple…
The correct answer is A. Specify the calculation of two trees on the switch With the highest TRILL root priority. See the full explanation below for the reasoning.
Question
Refer to exhibit. The switches in the exhibit form TRILL region. How can the administrator encourage the switches to load-balance broadcasts, multicasts, and unknown unicasts over multiple switch-to-switch links?
Options
- ASpecify the calculation of two trees on the switch With the highest TRILL root priority
- BEnable TRILL Equal Cost Multipath ( ECMP) on each switch
- CEnable TRILL ECMP on the switch With the highest TRILL root prionty
- DConfigure backbone links to support at least two VLANs on each switch
How the community answered
(29 responses)- A79% (23)
- B3% (1)
- C3% (1)
- D14% (4)
Community Discussion
No community discussion yet for this question.