You are installing a redundant power supply in an HP E8212 zl switch. Which procedures are recommended when installing the new power supply?(Select two.)

Options

  • ARemove the copper RFI shielding.
  • BAttach the new power supply to a different AC power source than the existing power supply to
  • CTighten the retaining screws on the new power supply until they are snug but not over- tight.
  • DConnect the redundant power supply to the AC power source before installing it in the switch.
  • ERemove the grounding tap from the console port before installing the power supply.