HP2-T25 · Question #40

An engineer will be installing an HP R7000 UPS and an Extended Runtime Module (ERM) in an existing HP 10642 G2 rack. This rack contains 10 DL380e Gen8 servers mounted 1U upward. How should the…

The correct answer is C. Mount the R7000 UPS at 10U in the 10642 G2 rack with the ERM on top of the R7000 UPS. See the full explanation below for the reasoning.

Question

An engineer will be installing an HP R7000 UPS and an Extended Runtime Module (ERM) in an existing HP 10642 G2 rack. This rack contains 10 DL380e Gen8 servers mounted 1U upward. How should the engineer perform this installation?

Options

  • ARemove the two lowest mounted DL380e Gen8 servers and mount the R7000 at the bottom of the
  • BRemove the lowest DL380e Gen8 servers and mount the R7000 and the ERM at the lowest position
  • CMount the R7000 UPS at 10U in the 10642 G2 rack with the ERM on top of the R7000 UPS.
  • DMount theR7000atthe highest position possible in the 10642 G2 rack with the ERM just below the UPS.
  • EMount the ERM at the highest position possible in the 10642 G2 rack with the R7000 UPS just below

How the community answered

(31 responses)
  • B
    10% (3)
  • C
    81% (25)
  • D
    3% (1)
  • E
    6% (2)

Community Discussion

No community discussion yet for this question.