As part of troubleshooting a problem at a customer site, the Fibre Channel cable was moved from one HBA to another on the host. As a result of this move, the controller no longer accepts I/O requests from the host. Which action can you take to address this issue with the least production impact?
Options
- AReboot the host server.
- BPower-cycle the primary controller.
- CRescan the disk channels.
- DReset the controller host port.