HP
HP0-Y50 · Question #37
HP0-Y50 Question #37: Real Exam Question with Answer & Explanation
Sign in or unlock HP0-Y50 to reveal the answer and full explanation for question #37. The question stem and answer options stay visible for context.
Question
A customer is seeking an upgrade for their campus LAN network. Currently, the customer has access layer switches that support 18.10/100/1000 Mbps ports and one Gigabit uplink. The customer wants better performancein the upgrade but also wants to minimize costs. The network architect has used the Network Traffic Analyzer (NTA) for Intelligent Management Center (IMC) to collect information about the access layer uplinks. These are the results: - For switches on Floor1, the peak utilization is 650 Mbps on a Gigabit uplink. On most days, the utilization peaks at about 400 Mbps. Peaks usually occur briefly. - For switches on Floo2, the peak utilization is 800 Mbps on a Gigabit Uplink. During active periods, the utilization often remain near 800. What is most appropriate plan for over subscription in the new access layer? (For this question, think only about oversubscription and not customer needs for redundancy)
Options
- A48 1 on floor 1 and 24 1 on floor 2
- B24.1 on floor 1 and 4.1 on floor 2
- C48 1 in all locations
- D24 1 in all locations
Unlock HP0-Y50 to see the answer
You've previewed enough free HP0-Y50 questions. Unlock HP0-Y50 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.